These pictures were taken December 21. The first picture shows painted doors on the third and fourth floors (east building) and painted railings on the fourth floor. The second picture shows the north parking lot. Until the Bertner Street extension is finished, entrance into the parking lot will be from Cecil Street (right side of picture), near the community building. The north, east drive way (eventually opening on Bertner) can be seen on the left ("under" the two cars). North of the parking lot (foreground of picture), there will be a small triangular area of landscape.