Building B is gone! Picture 1 shows demolition in progress. Picture 2 is pile of debris formerly known as Building B (Buildings A and D in the background). Picture 3 shows Building C in the background with old dumpster location in the foreground and part of Building B footprint on the right. Picture 4 shows the precision work that was done by the "demo machine" operator Ramiro (pictured). Pile of debris is at the left. Untouched rose garden in on the right (Building A on the left, Building D on the right). Other half of the rose garden is outside the construction fence. As soon as the debris is removed, we will be looking forward to a ground breaking. (Of course, this is after the construction contract is signed, permits are obtained, etc., etc. so be patient for the ground breaking pictures!)